Northland Cold Storage, Inc.

. .
Forklift

Customized Solutions

> Temperature Controlled Storage
. .
> Broad Range of Services
. .
> Full Service Transportation Solutions
We're the COLD Standard
Location: Home > Cold Storage > Locations > Construction Detour

Proposed Traffic Re-Routes – Hwy 172 Construction

Construction scheduled for February 2010 – August 2010

Re-route Map - Click to Enlarge
Proposed Stage 4 Traffic Control
Click map to enlarge
or Download PDF
Re-route Map - Click to Enlarge
Planned Traffic Impacts
Click chart to enlarge
or Download PDF

Notes:

> US 41 North to WIS 172 East Ramp Closed*
> WIS 172 East Vanderperren On/Off Ramps Closed*
> Oneida St. Closed at WIS 172 overpass & Detoured to Holmgren Way*
> Traffic converted to Westbound WIS 172 bridge lanes via crossovers with 2 Lanes Westbound, 1 Lane Eastbound comprising the traffic flow*

*For proposed traffic re-routes please refer to these route choices:

Proposed Traffic Re-Routes - Stage 4.pdf

For more information about this project go to the following DOT website:

http://www.dot.wisconsin.gov/projects/wis172construction/

Northland Cold Storage offers several cold storage warehouse locations in Green Bay and Wausau, serving central and northeast Wisconsin's cold storage needs.

We're Ready to Help

Caitlin Pokel Caitlin Pokel
Customer Service Rep
Green Bay
Building 7
P: 920-431-4600 ext 120
F: 920-431-4612
Email: cpokel@ncold.com

Client Login

Username:
Password:
Home | About Us | Cold Storage | Transportation | Resources and Links | FAQs | Contacts | Sitemap
Copyright © 2000- 2010 Northland Cold Storage, Inc. All rights reserved.
Website Design and Development by Strategraphic, LLC